Maps are posted to this web page following tahr control operations. These maps show where operations have taken place and how many tahr have been controlled.

As DOC does not target identifiable male tahr outside of the national parks (Management Unit 4), observations of identifiable males across parts of 425,000 ha of public conservation land have been recorded and are shared here to help hunters plan their next hunt.

DOC tahr control within the feral range under the 2024/25 Tahr Control Operational Plan was completed in March 2025. Control outside the feral range continued until 30 June 2025 in available weather windows.

2024/25 control updates and maps

Maps of aerial control operations within the Management Units, and sightings of identifiable males are available below. Maps of ground-based control undertaken within the feral range are also available. These maps were updated throughout the season.

Sightings of identifiable males within the Management Units during control operations under the Tahr Control Operational Plan 2024/25
Management unit Date range of operations included Identifiable male sightings Identifiable males observed

MU2 South Whitcombe - Whataroa

July 2024

Summary sightings map (PDF 2,335K)

13

MU2 South Whitcombe - Whataroa

August – October 2024

Summary sighting map (PDF, 4,722K)

141

MU3 Gammack/Two Thumb

August 2024

Summary sightings map (PDF 2,335K)

76

MU4b Aoraki Mt Cook National Park

August 2024

Summary sightings map (PDF 2,335K)

78

MU6 Landsborough

July - August 2024

Summary sightings map (PDF 2,335K)

37

MU6 Landsborough

October 2024

Summary sightings map (PDF, 4,347K)

99

Tahr controlled by DOC official aerial control operations in management units from July to November 2024
Management unit Date of operation Tahr control maps Tahr controlled

MU2 South Whitcombe - Whataroa

July 2024

Control map (PDF, 6,160K)

89 female and juvenile

MU2 South Whitcombe - Whataroa

August – October 2024

Control map (PDF, 4,723K)

325 female and juvenile

MU3 Gammack/Two Thumb

August 2024

Control map (PDF, 6,160K)

136 female and juvenile

MU4a Westland Tai Poutini National Park

August 2023

Control map (PDF, 4,358K)

966 animals

MU4b Aoraki Mt Cook National Park

August 2024

Control map (PDF, 6,160K)

661 animals

MU6 Landsborough

July - August 2024

Control map (PDF, 6,160K)

187 female and juvenile

MU6 Landsborough

October 2024

Control map (PDF, 4,305K)

116 females and juvenile

Tahr controlled by DOC official ground-based control operations in management units from January to March 2025
Management unit Date of operation Tahr control maps Tahr controlled

MU2 South Whitcombe – Whataroa

Adams River

February 2025

Includes data from previous operations

Control map (PDF, 8,366K)

1,303 female and juvenile, across 3 years

MU6 Landsborough

Landsborough River

January – March 2025

5x operations

Control map (PDF, 8,100)

 

1,232 female and juvenile

MU6 Landsborough

Makaawhio/Jacobs River

February – March 2025

2x operations

Control map (PDF, 8,046K)

 

400 female and juvenile